Isometric view showing the frame and internal layout of the high‑low BOP intervention skid.
Right side view of the HiLo BOP intervention skid with panel and internal equipment exposed.
Left side view of the HiLo BOP intervention skid showing side panels, piping sections, and internal assemblies.
Top view of the Hilo BOP intervention skid with upper panels and lifting structure
Front view of the HiLo BOP intervention skid with perforated panel sections.
Back view of the Hilo BOP intervention skid showing rear panels and mounted components.
Skids 

High-Low BOP Intervention Skid Gen. 2

The High-Low BOP Intervention Skid Gen. 2 is an ROV-mounted BOP skid engineered to support reliable ram closure during subsea well control operations. Its two-stage hydraulic system delivers high-flow movement and high-pressure shearing capability up to the maximum allowable working pressure (MAWP) of 5,000 psi.

Features

  • Stores up to 140 gallons of BOP fluid with optional seawater injection
  • Monitors system status with real-time pressure and flow data output
  • Supports modular, ROV-mountable design for ease of maintenance and repair

Contact Us

Our team of experts is ready to help you get started.

Oceaneering offers best-in-class products and solutions, backed by unparalleled quality, reliability, and global support. Fill out the inquiry form to start a conversation today.

``