OCEANEERING
Articles & News
flow assurance
articles
Oceaneering Secures IMR Survey Work for Australian Energy Company
Houston, Texas – Oceaneering International, Inc. announces that Oceaneering Australia secured an Inspection, Maintenance, and Repair (IMR) and Survey contract from a major Australian energy company. Oceaneering will mobilize in mid-November to carry out IMR...
Subsea Pumping Technology
Back in 2019, Oceaneering won a Spotlight on New Technology Award for its novel Subsea Pumping Technology (SPT) designs. Since then, Oceaneering has built hardware around this concept, and in 2020, started long term...
Oceaneering Rotator Unveils New Topside Chemical Throttle Valve
April 15, 2021 – Oceaneering International’s Rotator business has launched a new high-performance Topside Chemical Throttle Valve (T-CTV) for multiple industries including oil and gas, chemical processing, wastewater treatment, medical, and pharmaceutical. The T-CTV...
Oceaneering Remediation Solutions
Flow assurance governs the unrestricted transport of hydrocarbon fluids from reservoir up to the export facilities. When developing the field, engineers examine potential agents that can block flow such as the accumulation of solid...
Oceaneering Wins Connector Supply Contract from TechnipFMC
December 15, 2020 - Oceaneering International, Inc. (Oceaneering) announced that the company has been awarded a connector supply contract from TechnipFMC to provide 2-inch M5 Connectors and Chemical Throttle Valves (CTV) for the Khaleesi/Mormont...