{"id":64619,"date":"2020-04-08T12:31:50","date_gmt":"2020-04-08T16:31:50","guid":{"rendered":"https:\/\/oceaneering.com\/oceaneering-secures-seabed-clearing-contract-for-scottish-wind-farm\/"},"modified":"2024-02-08T06:49:34","modified_gmt":"2024-02-08T11:49:34","slug":"oceaneering-secures-seabed-clearing-contract-for-scottish-wind-farm","status":"publish","type":"post","link":"https:\/\/www.oceaneering.com\/es\/oceaneering-secures-seabed-clearing-contract-for-scottish-wind-farm\/","title":{"rendered":"Oceaneering consigue un contrato de limpieza del fondo marino para un parque e\u00f3lico escoc\u00e9s"},"content":{"rendered":"<p>Houston, 8 de abril de 2020 - Oceaneering International Services Ltd (OISL), filial de Oceaneering International, Inc. (Oceaneering), ha obtenido un contrato de Moray Offshore Windfarm (East) Limited (MOWEL) para completar la ruta del fondo marino y la limpieza de escombros para el proyecto del parque e\u00f3lico Moray East en Moray Firth, Escocia.<\/p>\n<p>La OISL proporcionar\u00e1 un conjunto completo de servicios para el proyecto, incluidos buque, herramientas de preparaci\u00f3n de rutas, veh\u00edculo operado por control remoto (ROV), prospecci\u00f3n y personal para completar las operaciones de trazado del lecho marino y desescombro de las rutas de los cables de exportaci\u00f3n del parque e\u00f3lico.<\/p>\n<p>El proyecto, que se completar\u00e1 a principios del segundo trimestre de este a\u00f1o, es el \u00faltimo que ha conseguido la OISL para Moray East, y las divisiones de ROV y utillaje de la empresa ya han tenido \u00e9xito apoyando los alcances del desarrollo.<\/p>\n<p>El trabajo, gestionado y realizado por el equipo de OISL con sede en Aberdeen, incluir\u00e1 el despliegue del arado de preparaci\u00f3n de rutas RP15, l\u00edder en el sector, que forma parte del sistema de despeje de rutas y rocas de Oceaneering, ampliamente probado sobre el terreno.<\/p>\n<p>El arado RP15, que se utilizar\u00e1 para despejar los cantos rodados antes de la instalaci\u00f3n de los cables, se ha desplegado en m\u00faltiples proyectos de parques e\u00f3licos del Mar del Norte, como Race Bank, Westermost Rough, las rutas de exportaci\u00f3n de Hornsea1 y East Anglia1 y las rutas de Beatrice for array, con m\u00e1s de 3.000 km de rutas despejadas con \u00e9xito hasta la fecha.<\/p>\n<p>\"Oceaneering tiene un historial probado de prestaci\u00f3n de servicios de desescombro de cantos rodados\", declar\u00f3 Marcel Sunier, Director de Proyecto de Moray East. \"Estamos deseando seguir trabajando con Oceaneering en este proyecto\".<\/p>\n<p>Allan Ralston, Director de Proyectos Renovables y Submarinos de Oceaneering, declar\u00f3: \"Estamos muy orgullosos de que MOWEL nos haya adjudicado este trabajo para el desarrollo de Moray East, aumentando as\u00ed nuestra presencia en este proyecto y sum\u00e1ndonos a las aspiraciones de contenido local del promotor.<\/p>\n<p>\"Nuestro arado de preparaci\u00f3n de rutas, de eficacia probada y demostrada, tiene un historial establecido de apoyo con \u00e9xito a varios proyectos de parques e\u00f3licos del Reino Unido hasta la fecha y proporcionar\u00e1 a nuestro cliente la soluci\u00f3n t\u00e9cnica m\u00e1s s\u00f3lida y rentable para la preparaci\u00f3n de rutas antes de la instalaci\u00f3n del cable de exportaci\u00f3n.\"<\/p>\n<p>El proyecto de construcci\u00f3n del parque e\u00f3lico marino Moray East se encuentra a 22 km de la costa de Caithness. Es el segundo de los tres parques e\u00f3licos de la zona y constar\u00e1 de 100 aerogeneradores, con una capacidad total de generaci\u00f3n de 950 megavatios, suficiente para abastecer a 950.000 hogares. Tres cables de exportaci\u00f3n de 86 km desde el mar hasta la costa transportar\u00e1n la electricidad del parque e\u00f3lico.<\/p>\n<p>M\u00e1s informaci\u00f3n: <a href=\"http:\/\/www.oceaneering.com\/es\/renewables\/\">oceaneering.com\/renewables<\/a><\/p>","protected":false},"excerpt":{"rendered":"<p>Houston, April 8, 2020 \u2013 Oceaneering International Services Ltd (OISL), a subsidiary of Oceaneering International, Inc. (Oceaneering), has been awarded a contract from Moray Offshore Windfarm (East) Limited (MOWEL) to complete seabed route and debris clearance for the Moray East Wind Farm project in the Moray Firth, Scotland. OISL will provide a full suite of &#8230; <a title=\"Oceaneering consigue un contrato de limpieza del fondo marino para un parque e\u00f3lico escoc\u00e9s\" class=\"read-more\" href=\"https:\/\/www.oceaneering.com\/es\/oceaneering-secures-seabed-clearing-contract-for-scottish-wind-farm\/\" aria-label=\"Leer m\u00e1s sobre Oceaneering Secures Seabed Clearing Contract for Scottish Wind Farm\">Seguir leyendo<\/a><\/p>","protected":false},"author":24,"featured_media":62796,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":"","_links_to":"","_links_to_target":""},"categories":[1129],"tags":[1280,1264,1282,1158,1283,1266,1410],"product_category":[1159],"loud_resource_industry":[],"regions":[1161],"search_tags":[1162,1398,1164],"class_list":["post-64619","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news-releases","tag-boulder-clearance","tag-offshore-wind","tag-ploughs","tag-renewables","tag-route-clearance","tag-wind-energy","tag-wind-farms","product_category-renewables","regions-united-kingdom","search_tags-regions","search_tags-renewable-energy","search_tags-uk"],"acf":[],"aioseo_notices":[],"_links":{"self":[{"href":"https:\/\/www.oceaneering.com\/es\/wp-json\/wp\/v2\/posts\/64619","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.oceaneering.com\/es\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.oceaneering.com\/es\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.oceaneering.com\/es\/wp-json\/wp\/v2\/users\/24"}],"replies":[{"embeddable":true,"href":"https:\/\/www.oceaneering.com\/es\/wp-json\/wp\/v2\/comments?post=64619"}],"version-history":[{"count":0,"href":"https:\/\/www.oceaneering.com\/es\/wp-json\/wp\/v2\/posts\/64619\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.oceaneering.com\/es\/wp-json\/wp\/v2\/media\/62796"}],"wp:attachment":[{"href":"https:\/\/www.oceaneering.com\/es\/wp-json\/wp\/v2\/media?parent=64619"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.oceaneering.com\/es\/wp-json\/wp\/v2\/categories?post=64619"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.oceaneering.com\/es\/wp-json\/wp\/v2\/tags?post=64619"},{"taxonomy":"product_category","embeddable":true,"href":"https:\/\/www.oceaneering.com\/es\/wp-json\/wp\/v2\/product_category?post=64619"},{"taxonomy":"loud_resource_industry","embeddable":true,"href":"https:\/\/www.oceaneering.com\/es\/wp-json\/wp\/v2\/loud_resource_industry?post=64619"},{"taxonomy":"regions","embeddable":true,"href":"https:\/\/www.oceaneering.com\/es\/wp-json\/wp\/v2\/regions?post=64619"},{"taxonomy":"search_tags","embeddable":true,"href":"https:\/\/www.oceaneering.com\/es\/wp-json\/wp\/v2\/search_tags?post=64619"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}