{"id":64602,"date":"2019-08-14T16:45:49","date_gmt":"2019-08-14T20:45:49","guid":{"rendered":"https:\/\/oceaneering.com\/oceaneering-wins-subsea-wellhead-removal-from-lundin\/"},"modified":"2019-08-14T16:45:49","modified_gmt":"2019-08-14T20:45:49","slug":"oceaneering-wins-subsea-wellhead-removal-from-lundin","status":"publish","type":"post","link":"https:\/\/www.oceaneering.com\/es\/oceaneering-wins-subsea-wellhead-removal-from-lundin\/","title":{"rendered":"Oceaneering se adjudica la retirada del cabezal de pozo submarino de Lundin"},"content":{"rendered":"<p>Houston, 14 de agosto de 2019 - Oceaneering International, Inc. (\"Oceaneering\") ha anunciado que su subsidiaria de propiedad total Oceaneering AS ha asegurado un contrato de Lundin Norway AS que cubre la extracci\u00f3n del pozo submarino Jorvik en Noruega, con opciones para pozos adicionales.<\/p>\n<p>Se espera que el proyecto de retirada, que forma parte de una campa\u00f1a multicliente de persecuci\u00f3n de plataformas en curso, comience este oto\u00f1o y tarde entre 3 y 4 semanas en completarse. La gesti\u00f3n del contrato es una operaci\u00f3n transfronteriza entre los equipos de Oceaneering en Noruega y el Reino Unido.<\/p>\n<p>\"Estamos encantados de trabajar con Lundin Norway en esta campa\u00f1a que presenta nuestra soluci\u00f3n de extracci\u00f3n de cabezas de pozo desde buques\", declar\u00f3 Rune H. Rosnes, Director de Desarrollo de Negocio de Oceaneering. \"Nuestras campa\u00f1as multicliente permiten a todos los operadores beneficiarse de econom\u00edas de escala, reduciendo as\u00ed al m\u00ednimo los costes de taponamiento y abandono submarinos.\"<\/p>\n<p>\"Hemos considerado la relaci\u00f3n coste\/beneficio y el riesgo de trasladar esta actividad de la plataforma al buque y nos ha parecido atractivo adjudicar este contrato a Oceaneering\", declar\u00f3 Geir Smaaskj\u00e6r, Director de Operaciones de Lundin en Noruega.<\/p>\n<p>Hasta la fecha, Oceaneering ha adjudicado m\u00e1s de 10 pozos en el Reino Unido y Noruega a su campa\u00f1a multicliente Rig Chase 2019.<\/p>\n<p><strong>Obtenga m\u00e1s informaci\u00f3n sobre nuestras soluciones de retirada de cabezas de pozo con embarcaci\u00f3n:<\/strong><br \/>\n<a href=\"https:\/\/www.oceaneering.com\/es\/decommissioning\/subsea-wells\/vessel-based-wellhead-removal\/\">oceaneering.com\/decommissioning\/subsea-wells\/vessel-based-wellhead-removal<\/a><\/p>","protected":false},"excerpt":{"rendered":"<p>Houston, 14 de agosto de 2019 - Oceaneering International, Inc. (\"Oceaneering\") ha anunciado que su subsidiaria de propiedad absoluta Oceaneering AS ha asegurado un contrato de Lundin Norway AS que cubre la remoci\u00f3n del pozo submarino Jorvik en Noruega, con opciones para pozos adicionales. El proyecto de extracci\u00f3n, que forma parte de una campa\u00f1a multicliente de ... <a title=\"Oceaneering se adjudica la retirada del cabezal de pozo submarino de Lundin\" class=\"read-more\" href=\"https:\/\/www.oceaneering.com\/es\/oceaneering-wins-subsea-wellhead-removal-from-lundin\/\" aria-label=\"Leer m\u00e1s sobre Oceaneering se adjudica la retirada del cabezal de pozo submarino de Lundin\">Seguir leyendo<\/a><\/p>","protected":false},"author":24,"featured_media":62768,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":"","_links_to":"","_links_to_target":""},"categories":[1129],"tags":[1148,1328,1374,1375,1177,1311,1376],"product_category":[1312,1342,1343,1181],"loud_resource_industry":[],"regions":[1183],"search_tags":[1162,1377,1184,1378,1379],"class_list":["post-64602","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news-releases","tag-norway","tag-oceaneering","tag-plug-and-abandonment","tag-rig-chase","tag-subsea","tag-well-decommissioning","tag-wellhead-removal","product_category-decommissioning","product_category-drilling-services","product_category-integrated-rig-services","product_category-remotely-operated-vehicles-rovs","regions-norway","search_tags-regions","search_tags-decommissioning","search_tags-norway","search_tags-rig-chase","search_tags-subsea-well"],"acf":[],"aioseo_notices":[],"_links":{"self":[{"href":"https:\/\/www.oceaneering.com\/es\/wp-json\/wp\/v2\/posts\/64602","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.oceaneering.com\/es\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.oceaneering.com\/es\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.oceaneering.com\/es\/wp-json\/wp\/v2\/users\/24"}],"replies":[{"embeddable":true,"href":"https:\/\/www.oceaneering.com\/es\/wp-json\/wp\/v2\/comments?post=64602"}],"version-history":[{"count":0,"href":"https:\/\/www.oceaneering.com\/es\/wp-json\/wp\/v2\/posts\/64602\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.oceaneering.com\/es\/wp-json\/wp\/v2\/media\/62768"}],"wp:attachment":[{"href":"https:\/\/www.oceaneering.com\/es\/wp-json\/wp\/v2\/media?parent=64602"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.oceaneering.com\/es\/wp-json\/wp\/v2\/categories?post=64602"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.oceaneering.com\/es\/wp-json\/wp\/v2\/tags?post=64602"},{"taxonomy":"product_category","embeddable":true,"href":"https:\/\/www.oceaneering.com\/es\/wp-json\/wp\/v2\/product_category?post=64602"},{"taxonomy":"loud_resource_industry","embeddable":true,"href":"https:\/\/www.oceaneering.com\/es\/wp-json\/wp\/v2\/loud_resource_industry?post=64602"},{"taxonomy":"regions","embeddable":true,"href":"https:\/\/www.oceaneering.com\/es\/wp-json\/wp\/v2\/regions?post=64602"},{"taxonomy":"search_tags","embeddable":true,"href":"https:\/\/www.oceaneering.com\/es\/wp-json\/wp\/v2\/search_tags?post=64602"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}