{"id":64415,"date":"2014-03-27T19:53:15","date_gmt":"2014-03-27T23:53:15","guid":{"rendered":"https:\/\/oceaneering.com\/oceaneering-solves-australian-umbilical-challenge\/"},"modified":"2023-11-13T15:42:12","modified_gmt":"2023-11-13T20:42:12","slug":"oceaneering-solves-australian-umbilical-challenge","status":"publish","type":"post","link":"https:\/\/www.oceaneering.com\/es\/oceaneering-solves-australian-umbilical-challenge\/","title":{"rendered":"Oceaneering resuelve el problema de los cables umbilicales en Australia"},"content":{"rendered":"<p><a href=\"https:\/\/www.oceaneering.com\/wp-content\/uploads\/2014\/03\/2014-03-aus-umbilical-photo.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-medium wp-image-11687\" src=\"https:\/\/oceaneering.com\/wp-content\/uploads\/2023\/11\/2014-03-aus-umbilical-photo-640x344-1.jpg\" alt=\"2014-03-aus-umbilical-photo\" width=\"640\" height=\"344\" \/><\/a><\/p>\n<p>Oceaneering International dise\u00f1\u00f3 y fabric\u00f3 un sistema umbilical con herramientas de instalaci\u00f3n especializadas para el proyecto de desarrollo de gas Macedon de BHP Billiton, frente a las costas de Australia Occidental. En funcionamiento desde septiembre de 2013, Macedon conecta pozos submarinos con una planta de gas natural de nueva construcci\u00f3n cerca de Onslow (Australia). Las especificaciones del proyecto llevaron un largo umbilical submarino a una zanja a lo largo de una playa, a trav\u00e9s de gruesas dunas de arena, bajo un r\u00edo, a trav\u00e9s de humedales y, finalmente, a la planta en tierra. Una herramienta de instalaci\u00f3n de uniones en l\u00ednea facilit\u00f3 la alineaci\u00f3n de los conectores para unir varias secciones del umbilical en la remota zona, donde las restricciones de peso del suelo eran cr\u00edticas.<\/p>\n<p>En tierra, el umbilical ten\u00eda que incluir protecci\u00f3n interna contra las termitas devoradoras de cables el\u00e9ctricos. En alta mar, el umbilical ten\u00eda que atravesar un tramo propenso a los gusanos Teredo (gusanos de los barcos), que excavan en los cascos de los buques y tambi\u00e9n en los cables el\u00e9ctricos.<\/p>\n<p>La sinergia de las soluciones para el proyecto Macedon qued\u00f3 demostrada mediante revisiones del dise\u00f1o y verificaciones de terceros. La resoluci\u00f3n paso a paso de los retos planteados demuestra el trabajo en equipo evidente en el producto final.<\/p>","protected":false},"excerpt":{"rendered":"<p>Oceaneering International dise\u00f1\u00f3 y fabric\u00f3 un sistema umbilical con herramientas de instalaci\u00f3n especializadas para el proyecto de desarrollo de gas Macedon de BHP Billiton, frente a las costas de Australia Occidental. En funcionamiento desde septiembre de 2013, Macedon conecta pozos submarinos con una planta de gas natural de nueva construcci\u00f3n cerca de Onslow (Australia). Las especificaciones del proyecto llevaron un largo umbilical submarino a una zanja a lo largo de una playa, a trav\u00e9s ... <a title=\"Oceaneering resuelve el problema de los cables umbilicales en Australia\" class=\"read-more\" href=\"https:\/\/www.oceaneering.com\/es\/oceaneering-solves-australian-umbilical-challenge\/\" aria-label=\"Leer m\u00e1s sobre Oceaneering solves Australian umbilical challenge\">Seguir leyendo<\/a><\/p>","protected":false},"author":19,"featured_media":63278,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":"","_links_to":"","_links_to_target":""},"categories":[1129],"tags":[],"product_category":[],"loud_resource_industry":[],"regions":[1131],"search_tags":[],"class_list":["post-64415","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news-releases","regions-australia"],"acf":[],"aioseo_notices":[],"_links":{"self":[{"href":"https:\/\/www.oceaneering.com\/es\/wp-json\/wp\/v2\/posts\/64415","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.oceaneering.com\/es\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.oceaneering.com\/es\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.oceaneering.com\/es\/wp-json\/wp\/v2\/users\/19"}],"replies":[{"embeddable":true,"href":"https:\/\/www.oceaneering.com\/es\/wp-json\/wp\/v2\/comments?post=64415"}],"version-history":[{"count":0,"href":"https:\/\/www.oceaneering.com\/es\/wp-json\/wp\/v2\/posts\/64415\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.oceaneering.com\/es\/wp-json\/wp\/v2\/media\/63278"}],"wp:attachment":[{"href":"https:\/\/www.oceaneering.com\/es\/wp-json\/wp\/v2\/media?parent=64415"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.oceaneering.com\/es\/wp-json\/wp\/v2\/categories?post=64415"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.oceaneering.com\/es\/wp-json\/wp\/v2\/tags?post=64415"},{"taxonomy":"product_category","embeddable":true,"href":"https:\/\/www.oceaneering.com\/es\/wp-json\/wp\/v2\/product_category?post=64415"},{"taxonomy":"loud_resource_industry","embeddable":true,"href":"https:\/\/www.oceaneering.com\/es\/wp-json\/wp\/v2\/loud_resource_industry?post=64415"},{"taxonomy":"regions","embeddable":true,"href":"https:\/\/www.oceaneering.com\/es\/wp-json\/wp\/v2\/regions?post=64415"},{"taxonomy":"search_tags","embeddable":true,"href":"https:\/\/www.oceaneering.com\/es\/wp-json\/wp\/v2\/search_tags?post=64415"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}