Los buzos de saturaciĂłn realizan tradicionalmente trabajos de inspecciĂłn, mantenimiento y reparaciĂłn (IMR) en instalaciones submarinas. Sin embargo, no siempre es posible utilizar buzos debido a la preocupaciĂłn de los operadores por la seguridad de los buzos que trabajan en entornos marinos con corrientes elevadas.

While already at an advanced stage in the development of an innovative long-term resident ROV system, Oceaneering recent began work with Equinor on a pilot project to design a shorter-duration resident vehicle. Unsurprisingly, the two vehicles are completely different.

Strongly backing the Brazilian market, Oceaneering has signed a new drill pipe riser contract with Petrobras for well completion. It has also supplied umbilicals for the Atlanta field, in the Santos Basin, operated by Queiroz Galvao Exploration and Production (QGEP), Pierre Christophe Vin, Oceaneering’s country manager for Brazil enthusiastically declared that, “The Brazilian market has … Seguir leyendo