Field Development Questionnaire

Preparing a budgetary AFE for your field development prospect?

Oceaneering can help. We provide cost-effective solutions by applying our extensive experience working on varied field development projects. According to your project needs, we create plans for system engineering, subsea equipment and hardware, installation services and project management.

Your project's complexities may require further discussions. During the field development planning process, we can assist with options and costs as you define your requirements. We look forward to sharing our capabilities and expertise with you and your company. Please contact us with any questions. 


 

Please fill out our Field Development Questionnaire below. We will evaluate your confidential information and prepare an estimate for you at no charge. Items marked with (*) are required fields.

General Information

 *Your Name:

 

*Company Name:

 

*Phone Number:

  

*Fax Number:

  

*E-mail Address:

  

Existing Parameters  Well Information  Remarks
Block:
*Coordinates
(option: give offset distance to other well or platform):
*Water Depth ft:
Flow Rate and Well Information Well Information Remarks

*Gas rate:

*Oil/Condensate rate:

*Water rate:

*Shut-In Wellhead Pressure:

Flowing Wellhead Pressure:

Flowing Wellhead Temperature:

H2S content? / How much?:

CO2 content? / How much?:

How many SCSSV's are envisioned?

Anticipated downhole tubing size:

Is data acquisition desired?
(If yes, at tree or downhole, or both?)

How many chemical injection lines are envisioned?

Preferred style of subsea tree?

 Conventional     Horizontal     Mudline
Platform
Block / Platform Designation:
Coordinates:
Water Depth ft:
Are there existing flowline risers or J-Tubes available for use? If so, please describe:
Are there existing umbilical "I" Tubes available for use? If so, please describe:
Preliminary Design Information
Is pigging desired?
Are you interested in considering a subsea pig launcher?
How many flowlines are planned?
What I.D. of flowline is planned? (Oceaneering can make a recommendation if unsure.)
When is start-up planned?
Is there any survey information along the route or at the Wellhead location? If so, please include:
What is the anticipated sequence of project execution?

Please check which one applies below:

 A     B     C

A) Tree installed 1st, followed by flowline and umbilical installation later.

B) Flowline and umbilical installed 1st, rig mobed to well site later for completion and tree installation.

C) Not Sure