|
|
  | |
|
|
MOBILE OFFSHORE PRODUCTION SYSTEMS |
|
|
| Mobile Offshore Production Systems |
|

|
Contact Info
|
|
|
Mobile Offshore Production Systems (MOPS) offer a cost-effective alternative to conventional fixed platforms for a broad range of field applications. A MOPS is readily movable and can be floated onto a field and installed complete, ready to produce oil. All construction work can be performed at a shipyard or dock facility. When the field is depleted, the MOPS can be removed quickly and inexpensively and redeployed to another field.
|
| | |
Engineering
| Engineering |
|

|
Contact Info
|
|
|
Oceaneering Senior Management places a high priority on engineering excellence, commitment and professionalism as a necessary basis for successful project design, planning and execution. Engineering project support for subsea field development and mobile offshore production systems (MOPS) encompasses all of the following:
|
| | |
Major Projects
| Gulftide Conversion |
|

|
Contact Info
|
|
|
Successful projects don't just happen. A successful MOPS conversion requires the right blend of people, systems and experience. All three were combined in the schedule-driven conversion of the jackup Gulftide using Oceaneering's fast-track project management methods. Highlights of the project include:
|
| | |
view all...
Units In Service
| Medusa Spar |
|

|
Contact Info
|
Brochure
|
|
Located at Mississippi Canyon 582 and moored in 2200 feet of water, the Medusa Spar has a processing capacity of 40,000 bopd and 110 MMscfd. Medusa serves as a production hub for deepwater field developments in the surrounding Gulf of Mexico area and can accommodate a total of nine subsea wells. The asset came online in 2003 with six dry trees and is now off its peak production plateau. Built for a robust 20-year design life, the unit has currently available production capacity.
|
| | | | Ocean Legend |
|

|
Contact Info
|
Brochure
|
|
Oceaneering was awarded a time-charter contract in November 1999 by Woodside Energy and its partners to provide a jackup MOPS unit (JPU) for development of the Legendre fields on Western Australia's North West Shelf. Under the contract, which has a primary term of three years, Oceaneering converted its jackup Marine 7 to the JPU Ocean Legend for production service. The conversion took place at Friede and Goldman Offshore, Pascagoula, Miss. Oceaneering is scheduled to install the JPU at Legendre field in December 2000 and will operate it for the contract period. The conversion, transport and installation of the MOPU have an estimated capital cost of approximately $80 million.
|
| | | | Ocean Producer |
|

|
Contact Info
|
Brochure
|
|
Flexibility can make all the difference in getting a marginal field development project off the ground, flexibility that comes from:
-
Accelerated schedules
-
Effective risk control
-
Lower front-end costs
|
| | |
collapse...
|
|
|