Management of Change

Intent

To ensure that changes associated with the equipment, operation, procedures, materials or design that may affect the safety of personnel, equipment or the environment are evaluated and managed to ensure that risks remain at an acceptable level.

Expectations

A system must be in place, which describes how a change is identified, analyzed, approved and implemented. This must include

  • A definition of a temporary and permanent change
  • A method to approve the changes
  • A specified time limitation for temporary changes
  • Communicating the changes to the effected personnel

Changes to regulatory requirements, codes or industry practices must be tracked and a review to determine if any of the business processes, such as procedures, equipment, training need to be modified.

Verification

Adherence with this element will be verified by determining that:

  • Changes have been reviewed and analyzed before they are implemented
  • Changes have been communicated to the effected personnel

BACK TO OCEANEERING.COM