Main_01

 
 

Emergency Intervention Tooling

Contact Info

 

  • Pressure Cap Removal System
  • Valve Override System
  • Riser Recovery Clamp System
  • Retrofit Sand Detection Clamps
  • Pipeline Repair Tooling

Pressure Cap Removal Tool

  • Emergency Unplanned Intervention Tooling Package
  • Subsea Removal of Torque Tool Receptacles
  • Subsea Milling Machine for Gate Valve Stem
  • Designed Built and Tested From Scratch in Three Weeks

Valve Override System


 

  • High Torque Tool API Class V and Above
  • Large Bore Gate and Ball Valves

Riser Recovery System


  • Oceaneering's built-to order 7,000 lb. clamp, pull-tested to 700,000 lb., prior to subsea installation by ROV.

Retrofit Clamps for Sand Detection Monitoring


Prior to Subsea Installation

20 yr Life-ROV
Installed on any pipe size


Installed

Pipeline Repair Tooling

  • WASP assist as performed
  • ROV Practical